Case studies // problem > decision > verified result
Work
Six projects. Live artifacts linked where they exist.
- 01 The Moodle → Canvas Migration
A state-bid contract chose the LMS. The machinery I built decided what survived the move.
- 02 Moodle Lessons → SCORM
Canvas has no Lesson activity. A shared engine carried ACA-122's lessons across — upgraded.
- 03 Moodle XML → QTI Converter
Canvas accepted the quiz files, then silently dropped questions. This is the tool that fixed it.
- 04 The Interactive Study Tool Skill
A design practice encoded as an AI skill: topic in, deployable study tool out.
- 05 Wall & Partition Assembly
A Storyline labeling interaction for construction students — two years in active use.
- 06 The MKT-120 Course Build
Sixteen hybrid Rise/Storyline modules, volunteered. Three semesters of unattended grade passback.